There are existing regulations which regulate the development of WECS in Section 12-306-44 of the Douglas County Zoning and Land Use Regulations. A WECS may be for personal or commercial use, these two varying uses are referred to as P-WECS and C-WECS, respectively. Individual machines are also referred to as a turbine, wind tower, windmill, or wind pump. Wind Regulations Frequently Asked QuestionsĪ Wind Energy Conversion System (WECS) is a system of wind-driven generators that convert wind energy into electrical power. This came from an interest in better aligning the wind-regulations with that of the recently adopted solar-regulations. The Lawrence Douglas County Planning Commission directed Planning staff to review the existing regulations for Wind Energy Conversion Systems (or WECS) in January of 2022. Text Amendment initiated by Planning Commission TA-22-00031 Wind Energy Conversion Systems Section 12-306-44 Wind Energy Conversion Systems
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |